Refrigerator Delivery Prep & Setup Guide

Refrigerator with bright interior, glass shelves, and LED lighting, ready for food storage.

Refrigerator Delivery Prep

  • Someone 18 or older must be present at delivery.
  • Double-check the delivery address on your invoice to ensure it is correct.
  • If your location has a gate, lockbox, or entry code, please send it to us ahead of time or text it directly to us for smooth access.
  • Make sure your contact number is correct and active so we can reach you on the day of delivery.
  • Clear a path from entry to the install location.
  • Clear the under-sink cabinet space (if the ice maker shutoff valve is located there).
  • Use a cooler or ice to preserve food during the swap.
  • Verify the water supply valve is accessible (if applicable).
  • Make sure the breaker box is accessible.

Refrigerator Deliver & Install – What to Do Next

  • Allow 12 to 24 hours for the refrigerator to reach full cooling temperature.
  • Check all water connections for leaks.
  • Discard the first batch of ice before using (if applicable).
  • Review the user manual for maintenance tips and recommended settings.

Pro Tip: Keep the doors closed for 4–6 hours after installation to help it cool faster.

Additional Services (If Needed):