Refrigerator Delivery Prep & Setup Guide
Refrigerator Delivery Prep
- Someone 18 or older must be present at delivery.
- Double-check the delivery address on your invoice to ensure it is correct.
- If your location has a gate, lockbox, or entry code, please send it to us ahead of time or text it directly to us for smooth access.
- Make sure your contact number is correct and active so we can reach you on the day of delivery.
- Clear a path from entry to the install location.
- Clear the under-sink cabinet space (if the ice maker shutoff valve is located there).
- Use a cooler or ice to preserve food during the swap.
- Verify the water supply valve is accessible (if applicable).
- Make sure the breaker box is accessible.
Refrigerator Deliver & Install – What to Do Next
- Allow 12 to 24 hours for the refrigerator to reach full cooling temperature.
- Check all water connections for leaks.
- Discard the first batch of ice before using (if applicable).
- Review the user manual for maintenance tips and recommended settings.
Pro Tip: Keep the doors closed for 4–6 hours after installation to help it cool faster.